Migrating G Suite to Office 365 moves mail, calendars and contacts into Exchange Online, usually through Microsoft's IMAP migration path. IMAP moves messages only, so calendars, contacts and Gmail label structure need separate handling, which is where most self-run projects lose data.

G Suite to Office 365 at a glance
Fixed price£95 / $125 per mailbox
Typical duration3–4 weeks for 50 mailboxes
Native pathExchange Online IMAP migration, mail only
Not covered by IMAPCalendars, contacts, delegation, labels
Label mappingGmail labels flatten into Exchange folders
CutoverOne weekend, MX changed after full pre-sync

Why IMAP migration is not the whole job

Microsoft documents an IMAP-based path for moving G Suite mailboxes into Exchange Online, and it works well for what it does. What it does is messages. Calendars, contacts, delegation, shared drives, Google Groups and send-as permissions are all outside its scope, and it completes successfully without mentioning them.

That gap is the reason self-run G Suite migrations tend to be judged a failure a fortnight later. The mail is all there; the shared team calendar is not, the reception desk can no longer send as the main address, and nobody can find the client contact list.

  • Messages migrate cleanly through the IMAP path
  • Calendars need a separate export and import, with recurring events checked
  • Contacts and shared address books move independently
  • Google Groups map to Microsoft 365 groups or distribution lists, case by case
  • Send-as and delegation relationships are rebuilt, not copied

How Gmail labels behave in Exchange

Gmail is a label store, not a folder store. A single message can carry five labels; the same message in Exchange lives in exactly one folder. Every migration tool resolves this by picking a winner, and the rule it uses is rarely the one your users would have chosen.

We agree the mapping before the move: which labels become folders, which become categories, and which are dropped because they were an individual's filing habit rather than a shared structure. Users are told what changed before they see it, which converts a support ticket into a note in an email.

The cutover sequence

Authentication first. SPF is republished to describe Exchange Online, DKIM signing is enabled on the Microsoft side, and DMARC stays at a monitoring policy through the change so nothing is rejected while both platforms are sending. Then a full pre-sync while Google remains authoritative, then the MX change, then two delta passes.

Because Google stays live through the pre-sync, there is no point at which mail is in flight with nowhere to land. Senders retry automatically during the DNS change under standard SMTP behaviour.

What to decide before starting

Three decisions shape the whole project. What happens to Google Vault archives, which do not transfer to Microsoft Purview automatically and may carry retention obligations. What happens to shared drives, which are a permission graph rather than a folder tree. And whether any account is staying on Google, because a split estate needs split delivery rather than a clean MX change.

None of these are difficult once decided. All of them are expensive to revisit after cutover.

What we see that others don't say

Microsoft's own G Suite migration path is IMAP-based, which means it copies mail and nothing else: every calendar entry, contact and delegation relationship has to be moved by a separate mechanism, and the tool does not warn you that it skipped them.

What this doesn't cover

  • We do not migrate Google Vault archives into Microsoft Purview as a like-for-like retention transfer; retention obligations are mapped, not copied.
  • Shared drive permission graphs are reviewed with a named owner per department rather than migrated blindly.
  • Google Sites, Google Chat history and Keep notes have no supported migration path and are exported rather than migrated.

Get a fixed price for this

Send your seat count, current platform and deadline. You get a fixed price and an available cutover date, usually within one working day, from the engineer who would run the work.

Prefer to talk? Call +44 20 7183 3436 (Mon–Fri 08:00–18:00 GMT), or message WhatsApp +44 7403 423563.

Questions we get asked

Does Microsoft's G Suite migration tool move calendars?
No. The Exchange Online path for G Suite is IMAP-based and moves messages only. Calendars, contacts, delegation and send-as permissions all require separate handling.
What happens to Gmail labels in Office 365?
Labels flatten into Exchange folders, and a message carrying several labels lands in one folder. The mapping should be agreed before the migration rather than left to the tool's default.
How long does a G Suite to Office 365 migration take?
Three to four weeks for around 50 mailboxes, with one weekend of cutover and two delta syncs afterwards at 7 and 14 days.

How this page is verified

Reviewed by Workspace Migration Services migrations desk, Google Workspace migration engineers. Last checked .

  • The IMAP-only scope of Exchange Online's G Suite migration path is documented by Microsoft as of 2026-08-12.
  • Per-mailbox pricing reflects the Workspace Migration Services rate card as of 2026-08-12.
  • SMTP retry behaviour during the MX change follows RFC 5321 section 4.5.4.

Sources you can check

Cite this page

Free to reuse with attribution. Copy whichever form your publication needs.

Plain citation

Workspace Migration Services, "Migrate G Suite to Office 365", https://workspacemigration.services/migration/migrate-g-suite-to-office-365 (last checked 2026-08-12).

HTML with source link

<p>Microsoft's G Suite migration path for Exchange Online is IMAP-based and moves messages only; calendars, contacts and delegation require separate migration. Source: <a href="https://workspacemigration.services/migration/migrate-g-suite-to-office-365">Migrate G Suite to Office 365</a> — Workspace Migration Services.</p>

Embed this table

<table>
  <caption>Migrate G Suite to Office 365 — Workspace Migration Services, 2026-08-12</caption>
  <tr><th>Fixed price</th><td>£95 / $125 per mailbox</td></tr>
  <tr><th>Typical duration</th><td>3–4 weeks for 50 mailboxes</td></tr>
  <tr><th>Native path</th><td>Exchange Online IMAP migration, mail only</td></tr>
  <tr><th>Not covered by IMAP</th><td>Calendars, contacts, delegation, labels</td></tr>
  <tr><th>Label mapping</th><td>Gmail labels flatten into Exchange folders</td></tr>
  <tr><th>Cutover</th><td>One weekend, MX changed after full pre-sync</td></tr>
</table>
<p><a href="https://workspacemigration.services/migration/migrate-g-suite-to-office-365">Migrate G Suite to Office 365</a> — data maintained by Workspace Migration Services.</p>

Related pages

Leaving Google? We will run it cleanly rather than argue.

We quote moves out of Google exactly as we quote moves in. Send your mailbox count and deadline for a fixed price and a cutover date.