Office 365 to Google Workspace migration

Migrating from Office 365 to Google Workspace moves Exchange Online mailboxes, OneDrive and SharePoint content, and Teams files into Google's equivalents. The technically hard part is not mail, which transfers cleanly; it is translating SharePoint's permission inheritance into Google's shared drive model.

Microsoft 365 to Google mapping
Exchange Online mailboxGmail user account, full folder tree preserved
Shared mailboxGoogle Group with collaborative inbox
OneDriveMy Drive, ownership preserved
SharePoint siteShared drive, one per permission boundary
Teams files tabShared drive folder; chat history does not transfer
Typical duration, 50 seats3–4 weeks, one weekend cutover

Mail transfers cleanly; files need decisions

Exchange Online to Gmail is a well-trodden path. Folders become labels, the folder hierarchy is preserved as nested labels, and read state, flags and attachments come across. Rules and out-of-office settings do not transfer and are rebuilt, which for most users takes under five minutes and for a small number of power users takes a scheduled call.

Files are where the project needs your attention. SharePoint models permissions as an inheritance tree with breaks; Google models them as membership of a shared drive plus per-item exceptions. Those two models do not map one to one, so somebody has to decide where the boundaries sit. We produce that mapping as a spreadsheet and walk through it with each department owner before anything moves.

What does not come across

Teams chat history has no Google destination. Google Chat exists, but Microsoft does not expose an export path that preserves threaded chat into a third-party platform in usable form, so plan for chat history to be archived in Microsoft rather than migrated. The same applies to Planner boards, Power Automate flows and any Power App built against a SharePoint list.

Those are rebuild items, not migration items, and they belong in the project plan with named owners. Pretending otherwise is how migrations acquire a bad reputation: the mail moves fine, and then in week three someone discovers the approvals flow that quietly ran the purchase order process.

  • Teams chat history: archived in Microsoft, not migrated
  • Power Automate flows: rebuilt in Apps Script or a third-party automation tool
  • Power Apps on SharePoint lists: rebuilt in AppSheet or replaced
  • Outlook rules and signatures: rebuilt, usually via a policy-pushed template
  • Microsoft Bookings, Forms and Planner: replaced with Google equivalents

Licensing overlap and how to keep it short

You will pay for both platforms for a period. The goal is to keep that period to weeks rather than months. Microsoft's annual commitment terms mean most organisations cannot simply stop paying mid-term, so we plan the cutover date against the Microsoft renewal date wherever the calendar allows.

Where the renewal is far off, the cheaper answer is often to downgrade remaining Microsoft seats to the lowest tier that keeps archive access rather than cancelling outright. That keeps a read-only path to anything not migrated without paying full seat price for a platform nobody logs into.

The cutover weekend in order

Friday evening the MX records change and mail begins landing in Google. Overnight the final mail delta runs. Saturday is Drive and SharePoint content plus permission application. Sunday is verification: a sample of users across departments logs in, checks mail, opens a shared file, and accepts a calendar invite. Monday morning we are on site or on call for the first four hours.

The rollback position is simple and worth stating explicitly: until the final delta completes, the Microsoft tenant remains intact and authoritative, and reverting is an MX change back. After the final delta, rolling back means losing mail received in Google, so that is the point of no return and it is scheduled deliberately.

What we see that others don't say

SharePoint permission inheritance has no direct Google equivalent: a subsite that breaks inheritance three levels down usually collapses into a separate shared drive, which is why a Microsoft 365 estate with 40 sites often lands as 12 to 18 shared drives rather than a one-to-one mapping.

What this doesn't cover

  • We do not migrate Teams chat history. Microsoft's export formats do not reconstruct usable threaded conversation in Google Chat, so we archive rather than pretend.
  • Power Platform assets are rebuilt, not migrated, and are scoped as separate work with their own estimate.
  • We do not manage your Microsoft contract termination or negotiate with your Microsoft reseller. We give you the technical dates; the commercial exit is yours.
  • Hybrid Exchange estates with an on-premise server still in the mail flow need a discovery call before we can quote a fixed price.

Questions we get asked

Can we run Microsoft 365 and Google Workspace at the same time?
Yes, in a split-delivery configuration where one platform holds the MX record and routes unmatched addresses to the other. It works well for staged migrations above about 150 seats and adds coordination overhead below that.
Do Outlook users have to switch to Gmail?
Not immediately. Google Workspace Sync for Microsoft Outlook keeps desktop Outlook working against a Google mailbox, which is a useful transitional crutch. Most organisations retire it within two quarters because it limits access to newer Gmail features.
What happens to our SharePoint intranet?
Document libraries move to shared drives. A SharePoint intranet built with pages, web parts and news posts has no direct equivalent and is usually rebuilt in Google Sites, which is a content project rather than a migration task.
Will file version history survive?
Recent versions transfer for most file types. Full version history depth is not guaranteed across the boundary, so where retention matters we keep the Microsoft tenant in a read-only archive tier for the required period.

How this page is verified

Reviewed by Pearl Lemon Cloud migrations desk, Google Workspace migration engineers. Last checked .

  • Mapping table reflects Google Workspace and Microsoft 365 product capabilities documented by both vendors as of 2026-08-06.
  • Split-delivery routing behaviour follows Google's documented dual-delivery and split-delivery configurations.
  • Duration figures are Pearl Lemon Cloud project data for migrations completed in the twelve months to 2026-08-06.